20 Jan 2011
Spanish wind turbine manufacturer, Gamesa, has reached an agreement with Kiroba Elektrik Uretim to supply the Madranbaba wind farm in Turkey with 10 G9X-2.0 MW wind turbines, totalling 20MW of power. The contract also includes the transport, installation, assembly, operating and upkeep of the turbines over a period of 16 years. These turbines will avoid CO2 emissions of around 30,000 tonnes per year. The Madranbaba wind farm will start operations at some point between the end of 2011 and start of 2012, and will produce around 70GWh and supply energy to 35,000 households.
Reference:http://www.elmundo.es/elmundo/2011/01/19/paisvasco/1295460439.html
Blog Archive
-
▼
2011
(117)
-
▼
January
(21)
- Rüzgar santralleri satışa çıktı
- Rüzgârı arkalarına aldılar ufukta dev yatırımlar var
- Rüzgarda yerli türbini tercih eden kazanacak'
- Rüzgâr santralleri için TSK'dan izin alınacak
- TMMOB'dan enerji verimliliği açıklaması
- Çevreci kanunda bir Truva Atı çıktı
- EPDK, PETKİM'E RES LİSANSI'NI UYGUN BULDU
- 2011’de enerjiye 6.8 milyar yatırım
- Böyle üretim görülmedi!
- MMO: YENİLENEBİLİR ENERJİ KANUNU "ÜLKE ÇIKARLARI" ...
- Gezegenin Geleceği
- Yenilenebilir enerji yasası kimseyi memnun etmedi
- Gamesa to supply 10 wind turbines for Madranbaba w...
- Çamlıca’nın tepesine 48 metrelik rüzgâr gülü
- Yenidoğan'da Rüzgar Türbinlerinin Montajı Devam Ed...
- ÇİNE'DE MERA ALANINA RÜZGAR ENERJİSİ SANTRALİ KURU...
- Saran, güneş nöbetinde
- Yenilenebilir enerjinin yükselişi
- Doğa insanın hem bankası hem tapınağıdır
- İlk yerli türbin KOBİ'den
- Aksa Enerji, kapasitesini 4200 MW’a çıkaracak
-
▼
January
(21)
Sunday, January 23, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.